10 Nov 2026 By CISO Consulting team 41 views 5 min read

SAMA CRFR Findings Board Escalation: What Needs a Resolution

Not every SAMA CRFR finding belongs on the board agenda, and not every material gap can be closed by management alone. This article sets out four finding categories that warrant board resolution and a threshold for separating them from management authority.

A board table in a Riyadh office with a printed remediation plan and a laptop showing a risk dashboard.
In this article
  1. Why the approval level matters
  2. The four categories that require board resolution
  3. 1. Changes to the control framework
  4. 2. Risk-appetite breaches
  5. 3. Architectural remediation
  6. 4. Third-party terminations
  7. The escalation threshold
  8. Building it into the remediation plan
  9. Signs that your routing needs attention
  10. What a good outcome looks like
  11. How we support this

Remediation plans written after an assessment tend to fail in one of two ways. Either every finding is sent to the board, which clogs the agenda and dilutes attention, or material gaps are closed under management sign-off with no board visibility. Both weaken governance. This article explains SAMA CRFR findings board escalation: which four categories should result in a board resolution, and how to set a threshold that keeps everything else with management.

A note on scope. SAMA, through its Cyber Resilience Fundamentals Requirements (CRFR), expects clear accountability, defined decision rights and board-level oversight of cyber risk. The framework does not publish a finding-by-finding list of items requiring a board resolution. The four categories below are a practical reading of those governance expectations and of how decisions normally sit under an institution's own delegation of authority. Confirm them against your internal charters and your regulator correspondence.

Why the approval level matters

A board resolution is a record. It shows that the body accountable for the institution's risk position knew about a matter, weighed it and decided. Management sign-off shows that an executive with delegated authority acted within limits the board had already set.

Governance fails when the two are confused. A board that reviews routine patching exceptions has no capacity left for the decisions only it can take. A management committee that approves a change to the risk appetite has exceeded its authority, whatever its technical merit.

The four categories that require board resolution

1. Changes to the control framework

Adopting, retiring or materially restructuring the framework the institution uses to govern cyber risk is a board matter. Examples include approving a new cybersecurity policy at the top of the hierarchy, changing the framework used to measure maturity, or altering the mandate of the cybersecurity function.

Updating a procedure, a standard or a control owner under an approved policy stays with management. The test is whether the change alters the rules the institution has committed to, or only how it meets them.

2. Risk-appetite breaches

If a finding shows that exposure sits outside the appetite or tolerance the board approved, only the board can accept, defer or direct treatment of that position. Management may propose a treatment plan, but it cannot approve operating outside a limit it did not set.

Findings that sit inside appetite, even if they are rated high within a management risk register, are handled through normal risk acceptance under delegated authority.

3. Architectural remediation

Remediation that changes the technology or operating architecture, such as network re-segmentation, replacement of a core platform, or a move of critical workloads, usually carries significant budget, multi-year timelines and business-continuity exposure. The board should resolve on the investment and on the accepted risk during the transition.

A configuration fix, a tool tuning exercise or a contained upgrade does not need that level of approval.

4. Third-party terminations

Ending, or declining to renew, a relationship with a critical third party because of a cyber-risk finding affects service continuity, contractual exposure and sometimes customer outcomes. The board should resolve on termination of critical or material providers, and on any exit plan.

Remediation demands, enhanced monitoring or contract amendments with a provider are management decisions. Our Third-Party & Supply-Chain Cyber Risk service covers vendor tiering, due-diligence questionnaires, contract clauses, assessments and ongoing monitoring, and a clear tiering model is what makes it obvious which providers fall into the critical group.

The escalation threshold

The four categories identify the type of decision. A threshold identifies the weight. We suggest writing the threshold into the remediation governance plan as a short set of criteria, approved by the board once, so that routing is a matter of applying rules rather than debating each finding.

A workable threshold asks whether a finding or its remediation meets any of these conditions:

  • It requires a change to a board-approved policy, framework or mandate.
  • It places exposure outside the board-approved risk appetite or tolerance.
  • It requires expenditure or structural change above the management delegation limit.
  • It affects a critical service or a critical third-party relationship in a way that cannot be reversed by management alone.

If none apply, the matter stays with management and is reported to the board in summary. If any apply, it goes to the board with a recommendation and a record of options considered.

The exact limits, such as monetary values or the definition of a critical service, must come from your own delegation of authority and risk appetite statement. We do not recommend copying figures from another institution.

Building it into the remediation plan

  1. Map each finding to one of the four categories, or to management authority.
  2. Record the rationale for the routing in the plan, so that an examiner can follow it.
  3. Set the approving body, the target date and the evidence of closure for each item.
  4. Schedule board items against the calendar so that resolutions are not the critical path for urgent work.
  5. Report management-level closures to the board in a consolidated view, not item by item.

Signs that your routing needs attention

  • Board papers contain dozens of low-risk findings with no clear ask.
  • Material remediation has been approved by a management committee with no board record.
  • Committee terms of reference do not state which decisions are reserved to the board.
  • Nobody can explain why a particular finding went where it did.

Where these are present, the issue is usually decision rights and reporting lines rather than technical remediation. Our Cybersecurity Governance & Organization service addresses the function, its mandate, committees, roles and responsibilities, and how decisions reach the board.

What a good outcome looks like

The board sees a short list of decisions that are truly its own, each with options and a recommendation. Management closes the remainder under documented authority and reports it. When SAMA or an auditor asks why a finding was handled at a given level, the answer is written down and consistent.

How we support this

Our GRC Advisory service provides governance, risk and compliance expertise tailored to Saudi regulatory requirements, with SAMA CRFR among the frameworks covered. It runs as a 12-month retainer in four steps: onboard, plan, advise and report. In onboarding we understand your environment, obligations and priorities. In planning we agree the quarter's focus and advisory hours. Through the quarter we provide ongoing reviews, briefings and meeting support, and we report monthly with a quarterly review.

For remediation governance specifically, that means policy and document review, regulator and audit meeting preparation, and compliance posture tracking. Deliverables include a monthly advisory report, reviewed documents with recommendations, and a compliance posture dashboard.

If your remediation plan is in draft and the routing of findings is unclear, a review of the escalation threshold against your delegation of authority is a sensible first step. Speak with our GRC Advisory team about it.

Tags: SAMA CRFR Board governance GRC Remediation planning Risk appetite Third-party risk
Readiness self-check

How ready are you? Find out in two minutes

Answer a few questions for your framework. You get a score, your biggest gaps and — if you want it — a detailed assessment from our team.

Ready to talk about your compliance?

Tell us where you stand. We will show you the shortest path to what your regulator expects.

Regulatory updates in your inbox

SAMA, NCA and SDAIA changes and what they mean for your institution — once a month.

E-mails in

We confirm by e-mail; unsubscribe any time. Manage your subscription · Past issues

Schedule a Free Assessment