Plant engineers have good reasons to be wary of segmentation. A change that looks tidy on a diagram can interrupt a historian feed, break a vendor's remote session or stop a controller from talking to its supervisory system. This article sets out a staged approach to NCA OTCC network segmentation zones OT that keeps production protected at every step. The principle is simple: observe before you change, change the least risky thing first, and agree how to undo each change before you make it.
What the regulation expects, in plain terms
The National Cybersecurity Authority (NCA) publishes the OT Cybersecurity Controls (OTCC) for operational environments, alongside the Essential Cybersecurity Controls (ECC) that apply to the wider organization. Among other things, the OTCC expects operators to separate industrial networks from business networks, control the paths between them, and manage remote access and third-party connections. It does not ask you to rebuild the plant in a weekend. It asks for a defined, documented and controlled architecture, which you can reach in stages.
For facilities that are government-linked or operate critical infrastructure, the practical question is how to get from a flat network, where almost everything can reach almost everything, to one with defined zones, without a production incident along the way.
Step 1: Discover assets without disturbing them
You cannot zone what you cannot see. Start with an asset inventory, but be careful about method. Active scanning can upset older controllers and embedded devices that were never designed to handle unexpected traffic. Prefer passive methods first:
- Take a copy of traffic from a switch mirror port or network tap and analyse it offline.
- Read engineering records, vendor documentation and existing drawings.
- Walk the plant with operations staff to confirm what is physically installed.
- Record for each asset its function, vendor, firmware where known, location and owner.
Treat any active query as a planned activity with the control engineer present, a maintenance window and a clear stop condition.
Step 2: Observe traffic and learn the real communication map
Once you have a passive feed, watch it for long enough to cover normal operations, shift changes, batch cycles and routine maintenance. The aim is to learn who talks to whom, on which protocols and ports, and how often. Drawings usually differ from reality. You will typically find undocumented links, engineering workstations that reach many devices, shared services used by both business and plant systems, and vendor connections nobody remembered.
Write the findings as a simple communication matrix: source, destination, protocol, purpose, and whether the flow is required. Mark every flow as required, unknown or unwanted. The unknown flows are the ones to investigate with operations before anything is blocked.
Step 3: Sketch zones and conduits
The zones and conduits model groups assets that share a function and a risk level into a zone, and treats the allowed paths between zones as conduits that you can monitor and control. A first sketch for a typical plant might include:
- Enterprise or business network, outside the plant boundary.
- A demilitarized zone for data exchange, such as historian replicas and patch staging.
- Supervisory and operations zone, with servers and operator stations.
- Control zone for each process area, containing controllers and local networks.
- Safety systems, kept in their own tightly controlled zone.
- A remote access and vendor zone, ending at a controlled jump point.
Keep the first sketch coarse. Over-engineering the design is a common reason segmentation projects stall. For each conduit, note the permitted flows from your communication matrix, the direction, and who owns the decision to change them.
Step 4: Choose safe first changes
Not every change carries the same risk. Begin with changes that add visibility or tighten paths that are clearly unneeded, and leave changes inside control loops until last. Good candidates for a first phase include:
- Placing a firewall or controlled boundary between the business network and the plant, initially in monitor-only or permissive mode.
- Removing direct internet access from plant devices.
- Routing vendor and remote access through a single controlled entry point with logging.
- Blocking flows that your observation proved are unwanted and that operations has confirmed are unused.
- Moving shared services, such as file transfer or patch staging, into a data exchange zone.
Defer anything that would sit between a controller and its input or output devices, or that touches safety systems, until you have the evidence and the maintenance window to do it properly.
Step 5: Agree the rollback plan with operations
A change plan is not complete until operations has agreed it. For each change, record the following and have the plant manager or shift authority sign off:
- What will change, on which device, and at what time.
- Which process conditions must hold before starting, such as a stable batch state or a planned outage.
- What you will watch during and after the change, for example alarms, historian gaps and communication status to key controllers.
- The exact steps to restore the previous configuration, with the configuration backup stored and tested.
- The point of no return, and who has authority to call a rollback.
Make one change at a time, in a maintenance window where possible. Hold the previous state for an agreed period before closing the change.
Step 6: Tighten gradually and document as you go
After a boundary has run in monitor mode without surprises, move from permit-and-log to deny-by-default for that conduit, keeping only the flows in the matrix. Repeat zone by zone. Update the network diagram, the asset inventory and the communication matrix after each phase, because these documents become your evidence when you demonstrate alignment with the NCA OT controls. Add monitoring so that a new device or an unexpected flow is noticed rather than discovered later.
Where training fits
Segmentation succeeds when control engineers, network administrators and security staff share one vocabulary and one method. Industrial & OT Security Training is operational technology security training for plant, facility and engineering teams, covering network zones, safe testing, monitoring and the NCA OT controls. The program covers OT architecture and the zones and conduits model, safe asset discovery and passive monitoring, remote access and vendor connections, incident response in operational environments, and mapping to the NCA OT Cybersecurity Controls.
Delivery follows four steps: agree the audience, level, language and dates; tailor examples and labs to your institution; deliver instructor-led sessions on site or online; and assess with quizzes or practical exercises, followed by certificates with CPE hours. Training runs from one to five days, on site or online. Participants receive course materials and scenario exercises, an OT security checklist, a certificate with CPE hours and results per learner.
Foundation level suits people new to the topic, Intermediate suits those who do the work, and Advanced suits leads and specialists. Levels can be mixed in one program after a short skills check.
Closing
Moving from a flat network to defined zones is a sequence of small, reversible decisions made with operations, not a single cutover. If your plant team would benefit from working through these steps together, ask about Industrial & OT Security Training for your engineers and network administrators.