29 Nov 2026 By CISO Consulting team 0 views 5 min read

Case Study: Clearing Two Years of Unreviewed Firewall Rules

An anonymised account of taking a payment provider's perimeter from inherited, undocumented rules to a managed state before a PCI DSS assessment. The sequence is written so you can copy it for your own rule base.

A network engineer reviewing firewall rule listings on a monitor in a quiet operations room.
In this article
  1. The starting position
  2. Signs it is time
  3. The sequence we followed
  4. 1. Baseline: devices, rules and traffic flows
  5. 2. Harden: clean rules and close risky exceptions
  6. 3. Operate: change control, patching and monitoring
  7. 4. Review: rule reviews on a fixed cycle
  8. What was measured
  9. What took longer than planned
  10. What a good outcome looks like
  11. What a managed service takes over
  12. Next step

This firewall rule review PCI DSS managed firewall case study describes an anonymised engagement with a Saudi payment provider. It had inherited a perimeter whose rules had gone unreviewed for roughly two years, and it had an assessment approaching. No client is named and details that could identify the organisation have been removed. We do not quote improvement figures here, because the point is the sequence, not a headline number.

The starting position

The provider's firewalls worked. Traffic passed, the business ran, and nobody had reported a failure. The problem was that nobody could explain the rule base. Rules had been added by staff who had since moved on, and some carried no description. Several exceptions had been opened for projects that had finished. No one was recorded as the owner of any rule.

PCI DSS, the framework maintained by the PCI Security Standards Council, expects firewall and router configurations to be reviewed on a regular cycle, and expects changes to be approved and documented. Teams preparing for an assessment are usually asked to show that evidence, not just describe the intent. An inherited, undocumented rule base cannot produce it.

Signs it is time

The signs in this case are common to many payment firms and banks:

  • Rules with no description, no owner and no linked change request.
  • Broad "any" rules or temporary exceptions that outlived their purpose.
  • No current diagram showing which zones hold cardholder data and what can reach them.
  • Changes made urgently and recorded afterwards, or not at all.
  • Firmware and patching handled when someone remembers.
  • An assessment date that is closer than the team's confidence in its evidence.

The sequence we followed

We ran the work in four stages: baseline, harden, operate and review. You can follow the same order on your own rule base, whoever carries it out.

1. Baseline: devices, rules and traffic flows

The first stage was an inventory, not a clean-up. We listed every in-scope device, exported every rule, and compared the rules with observed traffic flows. This showed which rules were in use, which were never hit, and which flows had no rule that anyone could justify. We also drew the first version of a segmentation map, so the team could see which zones were meant to be separate.

2. Harden: clean rules and close risky exceptions

Each rule was then reviewed one by one. For every rule we asked four questions: what business purpose does it serve, who owns it, is the scope as narrow as it can be, and does it expose the cardholder data environment. The outcomes were recorded as one of the following:

  • Keep, with an owner and a documented purpose.
  • Tighten, by narrowing sources, destinations or services.
  • Remove, after a defined observation period and owner confirmation.

Risky exceptions were handled first, ahead of the tidy-up of harmless duplicates. Owner assignment was part of this stage rather than a later task, because a rule with no owner cannot be confirmed or removed with confidence.

3. Operate: change control, patching and monitoring

A clean rule base degrades if changes continue as before. We introduced change control with approval records, so that each new rule or modification has a requester, a justification, an approver and a date. Patch and firmware management and health and availability monitoring were brought into the same routine. The change log became the evidence that the clean state was being kept.

4. Review: rule reviews on a fixed cycle

Finally, rule reviews were placed on a calendar. Each review produces a report, and each report feeds the next one. Segmentation checks were included, so the team tested that the zones on the map were actually separated, rather than assuming it.

What was measured

We measured the same things before and after, and kept the method identical so the comparison was fair:

  • Number of rules per device, and how many had a named owner.
  • Number of rules with a documented business purpose.
  • Number of rules with no observed traffic over the review window.
  • Number of changes with a complete approval record.
  • Number of paths into the cardholder data environment that the segmentation map could not explain.

We have deliberately not published the values. Your own before and after figures are what matter for your assessor, and the discipline of counting the same items twice is worth more than any external benchmark.

What took longer than planned

Three things ran over our estimate, and we would plan for them again.

  • Owner assignment. Finding the right person for older rules took more time than the technical review. Some rules belonged to teams that no longer existed, and the decision moved up to management.
  • Observation periods. Some rules carry traffic only at month-end or quarter-end. We needed to wait through those cycles before recommending removal, which extended the hardening stage.
  • Segmentation findings. The segmentation checks surfaced a small number of unexpected paths between internal zones. Closing them needed change windows agreed with application teams.

What a good outcome looks like

At the end of the work, the provider could show an assessor a rule base in which every rule had an owner and a purpose. It had a change log with approval records, a current segmentation map, and a dated rule-base review report. It also had a calendar showing when the next review would happen. The assessor's questions then became a matter of retrieving evidence rather than reconstructing history.

What a managed service takes over

Once the baseline and clean-up are done, the burden is repetition. The Managed Firewall and Network Security service covers the operation of firewalls, intrusion prevention and segmentation, including change control, rule reviews, patching, monitoring and reporting for the perimeter and internal zones. The deliverables are rule-base review reports, a change log, a monthly availability and incident report and a network segmentation map. The service is ongoing on 12-month terms. It maps to PCI DSS, SAMA CSF, NCA ECC and ISO 27001.

Two practical points apply. The service manages existing devices from supported vendors, and the list is confirmed during scoping. It is typically delivered by a partner authorised for the vendor, with CISO Consulting advising, and the proposal states the exact arrangement.

Next step

If your rule base was inherited rather than designed, start with the baseline: devices, rules and traffic flows. If you would like that work done and then kept in a managed state, speak to us about Managed Firewall and Network Security, and we will confirm scope and supported devices at the outset.

Tags: PCI DSS firewall rule review managed firewall network segmentation change control case study
Readiness self-check

How ready are you? Find out in two minutes

Answer a few questions for your framework. You get a score, your biggest gaps and — if you want it — a detailed assessment from our team.

Ready to talk about your compliance?

Tell us where you stand. We will show you the shortest path to what your regulator expects.

Regulatory updates in your inbox

SAMA, NCA and SDAIA changes and what they mean for your institution — once a month.

E-mails in

We confirm by e-mail; unsubscribe any time. Manage your subscription · Past issues

Schedule a Free Assessment